Investigating into the factors responsible for public project abandonment in Owerri, Imo state Department:Building Technology By: samadchuks Project ID: 6459 Rating: (3.0) votes: 2 Price:₦3000 Get the Complete MaterialAbstractThe continuous abandoning of public projects at various levels of development all over the country is of great concern not only to the governments themselves but more to civil servants who are too inadequately accommodated. In this research work efforts have been made to identify, analyzed and discuss the basic causes of abandonment of federal capital development Authority (FCDA) projects. Chapter one serves as an introduction that outlines the background of the study, statement of the problems, aims/ objectives of the study, research questions, significance of the study, scope of and limitations of the study plus an overview of the study of the federal capital territory (FCT) Abuja. Chapter two serves as literature reviews definition of special terms and also introduces the reader to some housing policies in Nigeria. The third chapter serves as research methodology where all the sources and method of data collection used in this work are explained. Chapter four is the core of the research work where data collection from the fields is presented and analyzed. Chapter five is the conclusion and recommendation....Preview Download Preview +Other Building Technology project topics and materials you might be interested in»Causes of project abandonment in building construction industry and remedial measures»Causes of construction project failures and abandonments in Nigeria»Safety procedures and accident prevention methods in construction sites»Control of Noise Pollution and Sound Insulation in Buildings ( A Case Study of a Broadcasting Studio)»The implication and benefit of the use of softwares in building project construction (case study of selected software and firm)»Maintenance and servicing problems of specialist works in building»A study of prospects and problems of timber as external material in building production in hot climate region»The effect of quality control in the building construction process (a case study of Afikpo, Ebonyi state)»The impact of budgeting and budgetary control in construction project delivery in Nigeria»Project planning and programming as tools for effective project delivery»The use of building survey for maintenance of building in Nigeria ( A case study of one storey building at Owerri, Imo state)»Challenges of low-cost housing delivery in Nigeria (Case study of Imo state)»Use of formwork design and construction of high building»Effects of labour management in building construction site - case study of Owerri, Imo state»Design and construction of office complex for school of environmental design technology